PROJECT PROFILE

Pearle Hospitality Group is creating a new Burlington head office that blends thoughtful design, premium finishes, and flexible workspace solutions.

Founded in 1936 the company has always been about creating authentic meaningful experiences for each and every guest. From restaurants and a golf club to farm and luxury hotels, the Pearle Hospitality portfolio truly offers something special. In 2026 Pearle was in the process of transitioning to their brand-new Head Office in Burlington Ontario. The company selected SDI Design, a Toronto based award winning design firm to deliver on their vision.

After due diligence was completed by both SDI and a number of meetings with Pearle, mywall was selected to supply and install the Demountable Partition part of the overall design.
 

MyWall Logo
iQ Offices is a Canadian

The Challenge

Pearle wanted to make a statement. An impact. Therefore, there were quite a number of specific specification details, such as 10ft high office sections that would not be tied into a bulkhead or ceiling structure, reeded glass sections, a special laminated bronze tinted wired glass walkway entrance and finally the finish for framing and hardware had to be bronze.

 

The Solution

Mywall’s H5T System was selected as it is a sturdy and adaptable system that allows for a standalone installation. To keep the costs down mywall proposed to use a superior reeded film which once applied to the glazing, is difficult to tell the difference from actual reeded glass. Mywall purchased the unique bronze wired glazing, however the sheets only come in 8ft high sections, and the walkway was 12ft in height, so a transom was created. Finally in order to match the ladder pulls to the custom bronze frame finish, existing mywall stock of black ladder pulls were stripped and painted to match.

Customer Comments

We had a great experience working with MyWall and, in particular, Craig throughout the project.

Craig was extremely responsive and helpful during the design and quoting process, making it easy for our team to work through the details and move the project forward. Once we were ready to proceed, his team delivered on time and completed the installation in nearly half the time we had originally anticipated.

Just as importantly, when we identified a few minor deficiencies after installation, Craig and his team were back on site the very next day to address them. That level of responsiveness and commitment to getting things right really stood out to us.

We would absolutely use MyWall again. It’s a great product backed by an excellent team, and we would have no hesitation recommending them to others.

Kevin Forestell
Pearle Developments